Program Calculator

Time-based cost estimation — enter machine time and hourly rate

Formula: Total Cost = (Rate/Hr ÷ 60) × Time in Min

Actual machine run time for the job

min

Machine hourly rate in Indian Rupees

Rs./hr

(3900 ÷ 60) × 32 min

65.00 Rs./min × 32 min

Machine time cost estimate

2,080

Usage Notes

  • 1Enter the total machine run time from the CNC program output.
  • 2Default rate is Rs. 3900/hr — update if your current machine rate differs.
  • 3Use Copy Results to paste the estimate into quotes or job sheets.
  • 4Use Save to store results by project name; Load to retrieve them anytime.