Program Calculator
Time-based cost estimation — enter machine time and hourly rate
Formula: Total Cost = (Rate/Hr ÷ 60) × Time in Min
Actual machine run time for the job
min
Machine hourly rate in Indian Rupees
Rs./hr
(3900 ÷ 60) × 32 min
65.00 Rs./min × 32 minTotal Cost – Program
Machine time cost estimate
₹ 2,080
Usage Notes
- 1Enter the total machine run time from the CNC program output.
- 2Default rate is Rs. 3900/hr — update if your current machine rate differs.
- 3Use Copy Results to paste the estimate into quotes or job sheets.
- 4Use Save to store results by project name; Load to retrieve them anytime.